Cannabis Trimming Labor & Cost Calculator

Plan the work.
Put a number on the time.

Turn dry weight and your team’s measured pace into a labor budget. Then work backward from a finish target to the crew you would need.

How work becomes crew timeDry weight divided by individual productivity gives person-hours. Dividing that work across a crew gives elapsed hours. The four branches illustrate parallel work, not a staffing recommendation.DRY WEIGHTPERSON-HOURSWORK ÷ CREW = ELAPSED HOURS÷ individual rate
One workload. Shared across a crew.
Dry weight in poundsEditable example inputsUSD · 8-hour modeled days

01 / Workload & budget

What will this batch take?

Use dry material ready for the trim standard you are estimating. The sample productivity and wage are starting values, not industry benchmarks.

01

Your batch inputs

Productivity is pounds per person-hour. Use an observed rate for comparable material, finish quality and working time.

03 / Read the model

The work, the clock, the cost.

A

Work is person-hours.

Dry pounds ÷ pounds per person-hour gives the total labor requirement. Keep the material and finish standard consistent when measuring the rate.

50 lb ÷ 0.12 lb/person-hour = 416.7 person-hours
B

The crew changes the clock.

Person-hours ÷ people gives elapsed crew hours. Divide by eight for the modeled crew-days. Each person is assumed to maintain the same entered productivity.

416.7 person-hours ÷ 6 people = 69.4 elapsed hours
C

Rate turns work into cost.

Person-hours × wage × (1 + overhead ÷ 100) gives modeled labor cost. Divide by dry pounds for cost per pound.

416.7 × $20 × 1.18 ≈ $9,833.33
Adding people shortens the modeled job.

At an unchanged individual rate and hourly cost, the total person-hours and productive labor cost stay the same. Actual staffing, coordination, setup, breaks and paid idle time can change the result. The full-window budget above helps distinguish productive work from paying a complete crew window.

Make the input more useful

Measure a representative batch.

  1. Define the finish.Use the same dryness, material type and finished-product standard.
  2. Track the whole team’s hours.Sum person-hours for the work represented in your measurement.
  3. Divide pounds by person-hours.Enter that rate, then test a slower assumption for a difficult batch.

A planning estimate based on your inputs. The eight-hour day is a model convention, not a shift recommendation. Explore all calculators →

FAQ

Questions about this calculator

What is a good trimming rate?

There is no single universal rate. Use time-study data from your own team and product standard.

Why calculate person-hours separately from crew time?

Person-hours determine labor cost. Crew size determines how long the calendar job takes.

Can this compare contractors with employees?

Yes. Convert each option to an effective cost per person-hour or cost per pound and compare on the same finished-product standard.