Work is person-hours.
Dry pounds ÷ pounds per person-hour gives the total labor requirement. Keep the material and finish standard consistent when measuring the rate.
50 lb ÷ 0.12 lb/person-hour = 416.7 person-hoursHarvest operations / The planning desk
Plan the work.
Put a number on the time.
Turn dry weight and your team’s measured pace into a labor budget. Then work backward from a finish target to the crew you would need.
01 / Workload & budget
Use dry material ready for the trim standard you are estimating. The sample productivity and wage are starting values, not industry benchmarks.
Productivity is pounds per person-hour. Use an observed rate for comparable material, finish quality and working time.
—
02 / Work backward from a finish target
This planning target allocates eight modeled trimming hours to each person per day. Allow separately for time that is not represented in your productivity rate.
Fractions of a day are allowed.
—
—
This uses the rounded target crew × target days × 8 hours × hourly wage × overhead multiplier. It covers that full window, including capacity left after the modeled trimming is finished.
Keep the plan
Includes inputs, the current estimate, target crew and assumptions.
03 / Read the model
Dry pounds ÷ pounds per person-hour gives the total labor requirement. Keep the material and finish standard consistent when measuring the rate.
50 lb ÷ 0.12 lb/person-hour = 416.7 person-hoursPerson-hours ÷ people gives elapsed crew hours. Divide by eight for the modeled crew-days. Each person is assumed to maintain the same entered productivity.
416.7 person-hours ÷ 6 people = 69.4 elapsed hoursPerson-hours × wage × (1 + overhead ÷ 100) gives modeled labor cost. Divide by dry pounds for cost per pound.
416.7 × $20 × 1.18 ≈ $9,833.33At an unchanged individual rate and hourly cost, the total person-hours and productive labor cost stay the same. Actual staffing, coordination, setup, breaks and paid idle time can change the result. The full-window budget above helps distinguish productive work from paying a complete crew window.
Make the input more useful
A planning estimate based on your inputs. The eight-hour day is a model convention, not a shift recommendation. Explore all calculators →
There is no single universal rate. Use time-study data from your own team and product standard.
Person-hours determine labor cost. Crew size determines how long the calendar job takes.
Yes. Convert each option to an effective cost per person-hour or cost per pound and compare on the same finished-product standard.